Off-site production
Producing off-site and transporting as panels (as opposed to complete 3D rooms) allows us to reduce transport emissions, enable quick and efficient construction and save cost. An average lorry can either carry two 3D rooms or, as in Future-Built’s case, enough unassembled LGS beams to construct fifteen 8-room homes. Production at local, purpose-built satellites further reduces truck movements and therefore lowers transport costs and CO2 emissions.